Login
Login
National Data Archive
An Online Microdata Catalog
  • Home
  • Catalog
  • Citations
    Home / Central Data Catalog / BGD_2002_CLS_V01_M / variable [F3]
central

National Child Labor Force Survey 2002-2003

Bangladesh, 2002
Reference ID
BGD_2002_CLS_v01_M
Producer(s)
Bangladesh Bureau of Statistics (BBS)
Metadata
DDI/XML JSON
Created on
Apr 25, 2019
Last modified
Apr 25, 2019
Page views
89
  • Study Description
  • Data Description
  • Get Microdata
  • Data Files
  • Albania-2007--full
    data-5
CSV JSON

average length of water shortage (affecting production) in last fiscal year (c17)

Data file: Albania-2007--full data-5

Overview

Valid: 19
Invalid: 285
Type: Discrete
Decimal: 0
Range: -
Format:

Questions and instructions

Literal question
How long did these incidents of insufficient water supply last on average?
Categories
Value Category
-9 don’t know
1 less than one hour
2
3
5
6
10
12
16
17
18
20
22
24
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Duration of a water shortage can be estimated by considering the average duration of water insufficiencies that took place in a typical month.
National Data Archive

© National Data Archive, All Rights Reserved.