Login
Login
National Data Archive
An Online Microdata Catalog
  • Home
  • Catalog
  • Citations
    Home / Central Data Catalog / FSM_2009_ES_V01_M_WB / variable [F1]
central

Enterprise Survey 2009

Micronesia, Fed. Sts., 2009
Reference ID
FSM_2009_ES_v01_M_WB
Producer(s)
World Bank
Metadata
DDI/XML JSON
Created on
Apr 25, 2019
Last modified
Apr 25, 2019
Page views
657
  • Study Description
  • Data Description
  • Get Microdata
  • Data Files
  • Ecuador-2006--full
    data-1
CSV JSON

average length of water shortage (affecting production) in last fiscal year (c17)

Data file: Ecuador-2006--full data-1

Overview

Valid: 41
Invalid: 617
Type: Discrete
Decimal: 0
Range: -
Format:

Questions and instructions

Literal question
How long did these incidents of insufficient water supply last on average?
Categories
Value Category
-9 don't know
1 less than one hour
2
3
4
5
8
10
12
15
24
40
48
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Duration of a water shortage can be estimated by considering the average duration of water insufficiencies that took place in a typical month.
National Data Archive

© National Data Archive, All Rights Reserved.