Login
Login
National Data Archive
An Online Microdata Catalog
  • Home
  • Catalog
  • Citations
    Home / Central Data Catalog / URY_2012_GSHS_V01_M / variable [F1]
central

Global School-based Student Health Survey 2012

Uruguay, 2012
Reference ID
URY_2012_GSHS_v01_M
Producer(s)
World Health Organization, Centers for Disease Control and Prevention
Metadata
DDI/XML JSON
Created on
Apr 25, 2019
Last modified
Apr 25, 2019
Page views
775
  • Study Description
  • Data Description
  • Get Microdata
  • Data Files
  • FIES
CSV JSON

Construction expenses (EACONEXP)

Data file: FIES

Overview

Valid: 0
Invalid: 0
Type: Continuous
Decimal: 0
Range: -
Format:

Description

Definition
A contractor usually provides labor but sometimes he contracts
the entire structure without the owner providing any material. In
inquiring about expenses, try to provide the details as called for in this
subsection. Try to assess the construction enterprise if the net income
is realistic. Usually contractors are allowed a margin of profit of about
15 percent, which is added to the cost estimates of materials and labor.
The constructed price cost of labor is 30-40 percent of the total cost of
materials.
National Data Archive

© National Data Archive, All Rights Reserved.